Machine hourly rate
机时费 / 设备小时费率
In plain words
A machine costs money whether it is cutting or not: the loan, the floor space, electricity, the operator. Add it all up for a year, divide by the hours it actually earns, and you get what an hour of that machine must charge.
What it is
The charge per hour of machine time. It covers depreciation, floor space, power, maintenance and usually operator labour, divided by the hours the machine can realistically be sold. Some shops also fold overhead and profit into the rate; then they must not be added a second time in the price. Rates rise with axis count, size and precision.
Why it matters for products
Rate tables are per shop and per machine; a pricing engine needs them as configurable data, not constants.