Lean and quick changeover, SMED
精益生产与快速换型
In plain words
Cutting out waste: waiting, walking, redoing. One big target is changeover time, tackled like a racing pit stop: get everything ready beforehand so the machine stops only briefly.
What it is
Lean removes waste: waiting, motion, inventory, defects. SMED cuts changeover time by moving work outside the machine stop: preset tools, standard fixtures, zero-point clamping.
Why it matters for products
Setup time is the largest cost in high-mix work, so tools that shorten it pay back fastest.