Standard times and estimate-versus-actual feedback
工时定额与实际工时反馈
In plain words
Before a job, someone says how long it should take. Afterwards, the clock says how long it did take. Comparing the two, job after job, is how a workshop finds out which of its guesses are wrong and stops losing money on them.
What it is
A standard time is the time an operation should take, set from estimates, time studies or history, and used for quoting, scheduling and costing. Actual times come from operators booking on and off jobs or from machine data. The gap between the two shows where quotes lose money and which estimates to correct. Many shops never close this loop.
Why it matters for products
The calibration loop of a pricing engine: store the estimate per operation, capture the actual, and adjust the model per shop, machine and part family.