Statistical process control and process capability

统计过程控制与过程能力

Illustration of Statistical process control and process capability
A sketch of the idea, not an engineering drawing.

In plain words

Watching measurements over time to spot a process drifting before it makes bad parts. One number, Cpk, says how comfortably the spread of real parts fits inside the allowed range.

What it is

SPC tracks measurements over time to catch drift before parts go out of tolerance. Capability indices compare process spread with the tolerance band; Cpk ≥ 1.33 is a common requirement, higher for critical features.

Why it matters for products

A capability requirement effectively tightens the tolerance the shop must hold, and raises cost.

Learn first

Opens the way to

Making a part like this? Plan the process and estimate costs in Workspace.