Process plan and routing
工艺规程 / 工艺路线
In plain words
The recipe for a part: cut the raw bar, machine one side, flip, machine the other, clean the edges, coat, check. Each step names the machine, the tools and the time. Pricing and scheduling both read from this recipe.
What it is
The ordered list of operations to make a part: saw stock, operation 10 on a mill, operation 20 on the flipped part, deburr, heat treat, grind, inspect. Each operation names a machine, setup, tools and time.
Why it matters for products
The routing is the shared backbone of quoting, scheduling, work orders and costing.
Learn first
Opens the way to
- 45. Model-based cost estimation and should-cost
- 48. Secondary and finishing processes
- 50. Computer-aided process planning, CAPP
- 53. Work order and traveler
- 55. Manufacturing execution system, MES
- 56. Scheduling
- 103. Part families and similarity
- 113. Outsourcing and subcontracting
- 119. Blank preparation: sawing and profile cutting